Avoid a $225k fitout shock: Office relocation costs in Australia

Expect four main cost buckets: removalists and logistics, fitout and make-good, IT and telecoms, and indirects like downtime and cleaning. For a small-to-mid office, these commonly add up to a wide range once fitout and contingency are included, with fitout alone running into tens of thousands of dollars. Before you sign off a figure, scope your inventory and request three removalist quotes and two contractor quotes.


TL;DR:

  • Removing and logistics costs typically start from around $179 per hour for local moves but vary based on crew size, vehicle, access issues, and surcharges.
  • Major hidden costs include business downtime, IT cutover delays, permits, after-hours building charges, and small extras like signage and cleaning, which can significantly inflate the budget.
  • Building a reliable move budget requires securing multiple quotes for scope accuracy, adding 10-20% contingency, and including indirect costs like permits and staff disruptions.
  • Early IT sequencing and pre-move validation are critical for minimizing business impact, and staged invoicing or grants can ease upfront financial burdens.

EasyMove Services
easymoveservices.com.au
Move Your Office With Greater Control
EasyMove Services combines live tracking with personalised moving and packing services to help keep business goods safe and secure in transit.

Plan your office move

Table of Contents

Direct moving costs: removalists, packing, transport, insurance and storage

A removalist quote usually comes in one of two shapes. Hourly rates suit smaller offices with predictable load times, while fixed quotes work better for larger relocations where the provider can assess the job in advance and give you price certainty. Local or regional moving rates with EasyMove Services start from $179 per hour, which is a useful anchor when you’re comparing other quotes against a known benchmark.

Packing Kit

Crew size, truck size, travel time and building access all move the final number. A tight loading dock, a lack of lift access or a building that only allows after-hours deliveries will add time and often a surcharge. Additional movers, bigger trucks, and stairs often carry extra charges, so it pays to ask providers how they structure these add-ons before you commit.

Removalists moving cartons up office stairs

Packing materials and optional packing services are worth separating out in any quote, since some providers bundle them and others itemise them. Insurance is the other line item to check closely: a declared-value cover through the removalist differs from a separate insurer policy, and the gap between the two can matter if you’re moving expensive IT equipment or specialist furniture.

Storage and interstate freight are usually priced by pallet or volume, and that model tends to carry its own set of extra charges for handling, long carries or delayed pickup. When you’re comparing options, check:

  • Whether the quote is hourly or fixed, and which suits your move size
  • What crew and truck size are included as standard
  • Whether packing materials and insurance are itemised separately
  • How storage or interstate freight is priced, and what triggers extra fees

Hidden and indirect costs: downtime, IT cutover and small extras

The costs that blow out a budget are rarely the ones on the removalist’s invoice. They’re the ones nobody priced in advance.

  1. Downtime: estimate it by multiplying revenue or salary cost per full-time employee by the number of disrupted days, then apply that figure against your expected move window.
  2. IT cutover: budget for pre-move testing, server relocation, third-party carrier lead times and day-one support, since a case study on office relocation IT sequencing shows that early sequencing and pre-cutover validation are what keep a new office operational from day one.
  3. Approvals and after-hours charges: permits, certifier fees and building management fees for after-hours lift or loading dock access add up quickly in CBD towers.
  4. Small extras: cleaning, disposal, signage, stationery reprints and, occasionally, temporary accommodation for staff during a disrupted changeover.

A relocation case study shows that early IT sequencing and pre-cutover validation are central to minimising business-hours disruption, which is the single biggest lever most businesses underestimate when they first draft a budget.

Fitout and make-good: Australian cost bands per square metre

Fitout is usually the largest line item after the move itself, and it scales directly with finish level. Going Rate’s 2026 Australian cost data puts basic fitouts at $800 to $1,500 per square metre, mid-range at $1,500 to $2,500 per square metre, and premium fitouts above $2,500 per square metre. For a 150 square metre tenancy, that means a basic fitout lands between $120,000 and $225,000, while a mid-range fit lands between $225,000 and $375,000, purely on construction cost.

A few variables shift that number further:

  • A cold shell space (no ceiling, services or flooring) typically adds $400 to $700 per square metre in uplift before any finishes go in
  • Strip-out and make-good at lease end commonly runs $80 to $150 per square metre, and is often forgotten until the final months of a lease
  • Landlord incentives or fitout contributions, where negotiated, often amount to roughly 20% to 35% of gross rent over the lease term, which can materially reduce upfront capex
  • Designer fees typically sit at 5% to 12% of construction value, plus separate certifier and engineering fees

Approvals add their own lead time: expect four to ten weeks for standard sign-off, and a development application can push that out by months if the works trigger one.

How to build a realistic move budget and contingency

Building a defensible budget is a sequence, not a guess. Following a structured office relocation project guide keeps each step accountable.

  1. Inventory and scope the move: count desks, workstations, server racks and specialty items before you ask anyone for a number.
  2. Get three removalist quotes and two contractor estimates on the same scope, so you’re comparing like with like.
  3. Add indirects and approvals costs: downtime, permits, certifier fees and after-hours charges.
  4. Add contingency, typically 10% to 20% of the total, and lean toward the higher end when IT complexity, development application risk or a tight lease expiry are in play.

Cash flow matters as much as the total. Staged invoicing tied to milestones, negotiated landlord fitout contributions, and local grants such as the City of Perth Business Relocation Grant, which reimburses eligible costs starting at $10,000 and scaling with headcount, can all ease the upfront burden.

Pro Tip: Ask your fitout contractor to break provisional sums out of the fixed price, so a variation doesn’t quietly become a 20% budget blowout.

Getting quotes and choosing suppliers: a comparison checklist

Quotes are only comparable when they cover the same scope. Use this checklist, drawn from a commercial relocation planning checklist, before you sign anything:

  • Removalists: ask about insurance cover, crew numbers, truck size, a photo-based survey, stair or lift charges, after-hours rates, and parking or loading permits
  • Fitout contractors: check provisional sums, program milestones, approval responsibilities, and how snagging and handover are defined
  • IT vendors: confirm carrier lead times, pre-move testing windows, day-one floor support and a rollback plan if cutover fails
  • Normalise every quote: same scope, exclusions clearly listed, and payment milestones spelled out before comparing dollar figures

Relocations that significantly change an employee’s commute or working conditions can trigger consultation duties under Australian workplace law. The Fair Work Ombudsman’s guidance on workplace relocation makes clear that employers must consult staff about major changes, and an unreasonable relocation can give rise to redundancy entitlements.

Practical mitigations include:

  • Offering flexible or hybrid arrangements for staff facing a longer commute
  • Providing travel allowances or relocation assistance where the new site is materially further away
  • Considering voluntary redundancy packages where a role genuinely can’t be sustained at the new location
  • Documenting every consultation step and timeline, since clear records are what protect you if a dispute escalates

A practitioner’s view on where office moves go wrong

The three mistakes we see most often: under-budgeting IT cutover, treating make-good as an afterthought, and underestimating how much building access problems cost in extra crew hours. Each is avoidable with an early site survey and a realistic contingency line. Live tracking on goods in transit and office relocation project guidance are the two tools we lean on to keep a move visible and accountable from pack-up to sign-off.

— EasyMovers

How EasyMove Services helps you plan and book an office move

We handle office relocations as an operational project, not just a transport task, combining live tracking on your goods in transit with packing, disassembly and reassembly so your fitout and IT teams aren’t waiting on furniture to land.

EasyMove Services

To get a quick, accurate quote, send us:

  • A floor plan or seating chart for the new space
  • An inventory of desks, workstations and bulky items
  • Access photos for both buildings, including lifts, stairs and loading docks
  • Your preferred move date and any after-hours restrictions

We also support interstate moves and NDIS-funded relocations where staff or participants need tailored handling. Check current rates and book a date on our moving rates page.

FAQ

How much does it cost on average to move to Australia?

This figure depends heavily on origin country, shipment volume and whether you’re relocating a household or a business, and we don’t have a single Australia-wide average to quote. For an office relocation specifically, the bigger cost drivers are fitout and IT cutover rather than the move itself, as covered above.

What are the hidden costs of moving?

The costs most businesses miss are downtime, IT cutover testing, approvals and after-hours building charges, plus small extras like disposal, signage and stationery reprints. Estimating downtime as revenue or salary per employee multiplied by disrupted days is a practical way to put a number on it.

What are relocation expenses paid by the employer?

Where a relocation materially changes an employee’s commute or conditions, employers are expected to consult under Fair Work Ombudsman guidance, and may offer travel allowances, relocation assistance or, in some cases, redundancy. The specific expenses covered vary by employer policy and enterprise agreement.

What are the typical costs of hiring an employee in Australia?

This sits outside the scope of an office relocation budget and depends on award rates, superannuation and on-costs specific to each role, so we’d point you to a dedicated employment cost resource rather than guess a figure here.

Sources

Click to rate this post!
[Total: 0 Average: 0]

Like this article?

Share on Facebook
Share on Twitter
Share on Linkdin
Share on Pinterest

Leave Your Comments

Rated 5 out of 5

Booking Form

Note: Arvo Bookings Must Be Time-Flexible As As Trucks Will Head Your Way After The Morning Jobs Are Finished; Otherwise, Call Us To Discuss Alternatives.