Office Relocation Timeline: From Lease Review to First Week

A good office relocation timeline works backwards from one fixed date: the day your current lease ends, or the day your new space is ready, whichever comes first. Most small offices need at least three to four months from decision to moving day. Larger teams, or any move that involves a fitout, should plan in terms of a year or more. The rest of this guide breaks that window into stages, tells you who should own each task, and shows where moves usually slip.

We move offices across Australia, and the pattern is consistent. The trucks and the packing are the shortest part of the project. The weeks before them decide whether moving day is calm or chaotic.

EasyMove Services
Keep Your Office Move On Track
EasyMove Services combines live tracking with personalised moving and packing services to help keep your goods safe in transit.

Visit EasyMove Services

TL;DR

  • Work backwards from your lease end date and set every milestone against it, with a named owner for each task.
  • Start 12 months out for a mid-sized office with a fitout, and at least 3 to 4 months out for a small, ready-to-use space.
  • Book internet, phones and the removalist early. These are the items that most often run out of lead time.
  • Tell staff first, then clients and suppliers, and keep a single source of truth for the move date.
  • Treat moving day as an operational project: a load sequence, labelled zones and a first-morning checklist.

Table of Contents

How long an office move really takes

The honest answer is that it depends on three things: the size of your team, whether the new space needs building work, and how much IT and specialised equipment you own.

A small office of a handful of desks moving into a tenancy that is already fitted out can be organised in roughly three months, and sometimes less. A medium office of 20 to 60 people moving into a space that needs partitions, cabling or new joinery is a different project. You are negotiating a lease, designing a layout, getting landlord consent, building, and only then moving. That commonly stretches past six months, and many businesses start a year ahead to give themselves room for the unexpected.

The moving day itself is the short part. For a small office it is often a single day or an evening and a weekend. A larger business with server rooms, labs or archives may spread the physical move over several days. Your removalist can give you a realistic figure once they know your floor plan, lift access and equipment list.

If you want a practical cost picture alongside the schedule, our guide to office relocation costs in Australia shows where budgets tend to blow out.

How long an office move really takes — overview diagram

The timeline at a glance

Use this table as a skeleton, then adjust it to your lease and your headcount. The ranges are our planning guidance for a typical mid-sized office, not a fixed rule.

When Focus Typical owner
12 months out Lease review, space needs, budget, project owner appointed Director or operations lead
9 to 12 months Shortlist premises, advice from accountant and solicitor Director, finance
6 to 9 months Lease signed, layout and fitout design, approvals started Project owner
3 to 6 months Fitout underway, IT and telecom orders, removalist quote Project owner, IT lead
2 months out Staff briefings, floor plan sign-off, supplier notices Office manager
1 month out Packing plan, labels, change-of-address notices, printed items Office manager, team leads
1 to 2 weeks out Final walk-through, access and parking, IT shutdown plan Project owner, IT lead
Moving day Load sequence, supervision, tracking Project owner, removalist
First week Testing, snag list, old premises handover Office manager

12 months out: set the date and the owner

Start with your lease. Find the expiry date, the notice period for renewal or exit, and what it says about make-good, which is the work you must do to hand the old space back in its original condition. Those three items set your deadline and a good part of your budget.

Next, give the project a single owner. Committees slow office moves down. One person with authority to make decisions, plus a small group who report to them, keeps the project moving. Late decisions and changes of scope are among the most common reasons relocations run late, so agree early who signs off what.

This is also the time to think about whether the move makes financial sense. Moving to larger premises is a significant financial event, and business.gov.au points out that you should get advice from an accountant or solicitor on leasing versus buying and on your legal rights. The same source notes that each state and territory regulates retail tenancies, so if you are a retail business, read the legislation or the “Look before you lease” material for your own jurisdiction.

Finally, define what you need from the new space. Count desks today and in three years, meeting rooms, storage, and any equipment that needs special power or floors.

6 to 9 months out: premises, lease and design

If you do not yet have a new address, this is the stage where most delay happens. Inspections, negotiation and legal review each take longer than people expect, and good space in your preferred suburb does not wait.

Once you have a short list, take the lease to your solicitor before you commit. Ask about rent-free periods, incentives, fitout contributions, and what you must remove when you eventually leave.

If the space needs building work, the design and approvals sequence begins now. Landlord consent for works and any building permit are separate approvals, and each can take a few weeks at the very least, more in complex buildings. Build that waiting time into the plan rather than hoping for a fast answer. Your fitout builder will give you a program, and you should treat their handover date as the real date your move depends on, with a buffer of at least a couple of weeks behind it.

Note the December and January period. Many trades and suppliers slow down or shut for the holidays, so a project that crosses the new year should have extra time added to it. If you can choose, avoid finishing a fitout in that window.

3 to 6 months out: the long lead items

This is where an office manager earns their keep. A short list of items has long lead times and cannot be rushed at the last minute.

Internet and phone services come first. Connections to a new building can take weeks, and sometimes months, depending on the carrier and what is already in the building. Order as soon as the lease is signed and confirm the installation date in writing. If you have a data cabinet, server room or specialised network, plan its design with your IT provider now. Our IT-first relocation checklist covers what an office manager should sequence from 12 months out to the final week.

Next, get removalist quotes. Book your moving date early, particularly for end-of-month and end-of-financial-year weekends when demand rises. A removalist who understands commercial work will ask about lift access, loading dock hours, building rules and the volume of IT equipment. Moving servers, workstations and storage devices carries data and security obligations, and our guide to IT equipment moving and AS 5377 explains what to ask for.

Then deal with furniture. Decide what is coming, what is being replaced and what is going to charity or disposal. Modular workstations usually need to be dismantled and rebuilt, so confirm who does that and how long it takes. If you are weighing it up, read how to move office furniture without chaos.

2 months out: people, floor plan and communication

By now the project should be visible to everyone. Announce the move to staff before anyone hears it elsewhere. Give the new address, the date range, the commute changes and what will happen to parking. Acknowledge that people have questions about travel time and desk allocation, and tell them when they will get answers.

Then tell the outside world in a sensible order. Clients, key suppliers, your bank, insurer, accountant, landlord and any government registrations should hear in writing, with the new address and the date it takes effect. A short email, a note on your website and a line in your email signature will cover most of it.

Finalise the floor plan and give every team a zone. A numbered plan, with each desk and room assigned, saves hours on the day because the movers can place furniture without asking you at every doorway.

Also check your insurance. Confirm that your cover applies in transit and at the new address from the first day you have keys.

1 month out: packing, labels and printed items

This is the stage for a packing plan. Decide who packs what. Staff usually pack personal items and desk contents, while a professional team handles IT equipment, archives, artwork and anything fragile or heavy. Our professional packing services can take this load off your team, and the packing materials guide helps you order the right boxes.

Use a labelling system that works from the doorway. Colour code by zone and number each box with a team name and desk number, so a mover can read it from three metres away.

Colour-coded boxes grouped by office zone

Printed items are easy to forget. Business cards, letterhead, signage, forms, labels and brochures all carry your address, and print runs and approvals take time. A step-by-step print ordering guide for business helps you work out what to order and in what sequence so that new stock lands at the new address rather than the old one.

Start clearing out. Shred or archive old files, dispose of obsolete furniture and electronics, and cancel what you will not need. Every box you do not move is one you do not pay to move. We can also arrange a charity run or furniture disposal for items you no longer need.

1 to 2 weeks out: the final checks

Walk the new space with your project owner, IT lead and, if possible, your removalist. Check lift dimensions and booking requirements, loading dock hours, parking for the truck, floor protection, and whether the building requires a certificate of currency from your mover.

Confirm every booking in writing: the movers, the internet installation, the cleaners, the locksmith or access card supplier, and the handover from the fitout builder.

Plan the IT shutdown. Back up systems, label every cable and photograph how each workstation is connected. Agree when systems go offline and when they must be live again, because that window is the real deadline for your business.

If you are leaving a tenancy with a make-good clause, book your end-of-lease clean now. We offer an end of lease cleaning and moving service that pairs the two jobs.

Moving day: run it like a project

Moving day is an operational project, not a transport task. You need a load sequence, a person in charge at each end, and a way of knowing where your goods are.

Load in the order you want to unload. Server and network equipment goes on last and comes off first if systems need to be live early. Furniture is placed according to the floor plan, and boxes go into their coloured zones. Have one person at the old site checking that every room is empty, and one at the new site directing deliveries.

Plan for stairs and access. Our rates include an $80 one-off charge per flight of stairs, so it pays to tell us in advance if your building has no lift or the lift is small.

Our live tracking lets you follow goods in transit, which is useful when your IT lead is waiting at the other end and wants to know when the truck will arrive.

If you can, move at a quiet time. A weekend or evening move reduces downtime, although weekend and holiday work attracts a 10% surcharge on our rates.

The first days after the move

The job is not finished when the truck leaves. Plan for a short, structured recovery period.

On the first morning, arrive early and test the essentials before staff do: power, internet, phones, printers, access cards, alarm, air conditioning and the lifts. Keep your IT lead on hand for the day, and put a spare person on the front desk to answer questions.

Check deliveries against your inventory. Look for damaged furniture and missing boxes, and report any issues to your removalist promptly, with photos. Start a snag list for anything the fitout builder or landlord needs to fix, and keep it in one shared place.

In the first week, confirm that mail redirection, phone diversions and website and directory listings all show the new address. Check that you have returned keys and passes at the old premises, taken final meter readings, and arranged the make-good inspection. Ask your team what is not working, and fix the small things quickly because they affect morale more than you would expect.

Timeline template: what to track

Whether you use a spreadsheet or a project tool, each line of your plan should have the same columns: the stage, the task or deliverable, what it depends on, the owner, the target date, the confirmed date (with evidence such as an email or signed document), and any open risks or actions.

The dependency column matters most. Internet installation depends on the lease being signed. The staff announcement depends on the date being confirmed. Packing depends on the floor plan. When one date moves, you can see at once what else moves with it.

For a more detailed checklist to copy, see our ultimate checklist for moving offices and the commercial relocation planning checklist.

Small office versus larger relocation

A small office can compress the timeline, but it should not skip any stage. Your lease is simpler and a fitout is often unnecessary, so the plan may be as short as three months. The remaining tasks are the same: IT and phone, communication, packing and a first-day test. Our page on small office movers explains how we keep work moving through a compact move.

A larger relocation adds layers: stakeholder sign-offs, design workshops, approvals, staged moves by department and a longer settling-in period. Bigger moves benefit from a detailed office relocation project guide and a weekly project meeting once you pass the six-month mark.

Whatever the size, our top office move planning tips are a good place to sanity-check your schedule.

Our perspective: where timelines go wrong

In our experience, three things derail office moves. The first is that IT and phone lead times are left until the last month. The second is that nobody owns the plan, so decisions drift. The third is that the move is treated as a truck booking rather than a project with a sequence.

We would rather hear about your move early, even if the date is not firm. A conversation six months out lets us flag access issues, equipment that needs specialist handling and dates that will be busy. We plan loads in sequence, label by zone, and give you live tracking so you are never wondering where your goods are.

We would rather you call us too early than too late. A rough plan and a flexible date still lets us help you avoid the problems that cost the most.

— EasyMovers

Book your office move with EasyMove Services

Once your date is set, the next step is a quote. Our local and regional moving rates start from $179 per hour, with additional movers at $79 per hour per mover and a bigger truck available for $45 per hour. See the full moving rates, or read about our office relocation and moving services and get in touch to book.

FAQ

How far ahead should I start planning an office move?

For a small office moving into a ready-to-use space, start at least three to four months ahead. For a mid-sized or larger office, or any move that needs a fitout, start around 12 months before your lease ends. If your lease has a long notice period, begin even earlier.

What is the best time of year to move office?

A quiet period for your business is usually best, and many companies choose a weekend to limit downtime. Avoid finishing a fitout over December and January, when trades and suppliers are slower. Weekend and holiday moves with us carry a 10% surcharge.

Who should be in charge of the office move?

One named project owner with the authority to make decisions, supported by an IT lead and an office manager. Each task on your timeline should have a single owner and a target date. Our removalist team handles the physical move and works to your plan.

What should I check straight after moving in?

Test power, internet, phones, printers, access cards and the alarm before staff arrive. Then check deliveries against your inventory, record any damage with photos and start a snag list for the landlord or builder. In the first week, confirm that your address is updated everywhere it appears.

Sources

Click to rate this post!
[Total: 0 Average: 0]

Like this article?

Share on Facebook
Share on Twitter
Share on Linkdin
Share on Pinterest

Leave Your Comments

Rated 5 out of 5

Booking Form

Note: Arvo Bookings Must Be Time-Flexible As As Trucks Will Head Your Way After The Morning Jobs Are Finished; Otherwise, Call Us To Discuss Alternatives.